# Inspect Incoming Material

When material arrives, many plants check it before it's used: who supplied it, which lot it is, when it expires, and what
it looked like. Your Quality Manager decides whether your plant has a check like this and what it asks for. This lesson
uses the **Receiving Inspection**, if it has been created: the Quality Manager track builds it in
[Build a Receiving Inspection](../5-quality-manager/2-build-a-receiving-inspection.md). If your plant's check for incoming
material has a different name or different fields, the steps are the same.

## Add the Check for the Material

A check on a delivery is usually added by hand when the delivery arrives, rather than scheduled.

1. Open **Quality → Schedule → Active Checks** and click **Add Check**.
2. Choose the check sheet for incoming material.
3. If Kanoa asks for an item, choose the material that arrived and click **Add**. Some check sheets offer only the items
   they apply to, such as raw materials.
4. Open the new check.

![Add Check](https://docs.kanoa.ai/img/quality/addCheck.png)

The item ties the check to the material, so every inspection of that material can be found later.

:::info[In the Receiving Inspection]
The check sheet offers only raw material items. You'd choose `AL6061` for a delivery of aluminum bar.
:::

## Fill In the Fields

A check item can hold different kinds of value. These are the ones you're most likely to see on a check for incoming
material:

| Kind of value | What you do |
| --- | --- |
| **Pick list** | Tap a button. Each choice can count as a pass, a warning or a fail, or be **neutral**: recorded but not judged, such as the supplier. |
| **Text** | Type it, such as a lot number from the label. Click the blue **i** icon on the check for its instructions. |
| **Date** | Pick a date, such as the expiration date. |
| **Image** | Add a photo, such as the label or a damaged pallet. On a desktop you browse for a file; on a mobile device you can use the camera. |
| **Barcode** | On a mobile device with a camera, scan the label instead of typing it. |

1. Fill in each item.
2. Submit the check.

If the check sheet doesn't need a sign-off, the check goes straight to **Approved** when you submit it. If it does, it
waits as **Submitted** until a Quality Manager approves it.

:::info[In the Receiving Inspection]
The check asks for the **Supplier** (a neutral pick list), the **Lot Number** (text), the
**Expiration Date** and an optional **Product Image**. The lot number must be 6 to 20 characters in capitals, so a lot
number such as `ab123` is refused. It doesn't need a sign-off.
:::

{/*
TODO: Confirm on a gateway how a text value that doesn't match a required format is refused, and the exact wording of
the message. The format rule (6 to 20 capitals) is set in Build a Receiving Inspection.
*/}

## Take a Photo on Mobile

A mobile device is often easier at the dock: you can take the photo and scan the label where the delivery is.

1. Open **Mobile Check Schedule** and add the check for incoming material.
2. Fill it in as above. For an image item, take a photo with the camera.

::embed-section{src="../../kanoa-quality/entering-checks.md#enter-check-data" collapsed="true" summary="Reference Materials: Enter Check Data - How checks are entered on desktop and mobile."}

## Check Your Understanding

1. Why does Kanoa ask for an item when you add a check for incoming material?
2. What does a **neutral** choice on a pick list do?
3. When does a submitted check go straight to **Approved**?

<details>
<summary>Answers</summary>

1. The item ties the check to the material that arrived, so its inspections can be found later.
2. It records the answer without passing or failing the check, such as the supplier's name.
3. When its check sheet doesn't need a sign-off.

</details>
