# Build a Receiving Inspection

A receiving inspection is a good first real check sheet: it uses several kinds of check item, requires an item, and is
started by hand when a delivery arrives. This lesson builds the CoreForge sample plant's **Receiving Inspection**, the
same one Developer Training builds. Quality Inspectors then complete it in
[Inspect Incoming Material](../6-quality-inspector/2-inspect-incoming-material.md).

Building a check sheet needs the **Configure Quality** security function.

:::note[Building your own]
On your plant's gateway, use your own folder, item class, suppliers and fields. The steps are the same: a check sheet that
requires an item, and check items of the types your inspection needs.
:::

::embed-section{src="../../training/5-training-quality/02-receiving-inspection/2-build-receiving-inspection.md#build-the-receiving-inspection"}

:::warning[Releasing makes it live]
Releasing the check sheet makes it available to every user straight away. To change it after that, revise it: see
[Release and Revise](./6-release-and-revise.md).
:::

## Check Your Understanding

1. Why does the Receiving Inspection require an item?
2. What does a **Neutral** supplier response do?
3. A user enters the lot number `ab123`. What happens, and why?

<details>
<summary>Answers</summary>

1. It ties each inspection to the material received, and limits the choice to raw material items.
2. It records the supplier without passing or failing the check.
3. It's refused. The lot number must be 6 to 20 uppercase letters and digits.

</details>
