Loss Analysis
OEE tells you how well your assets ran while they were scheduled to produce, but not where the rest of their time went, or which losses cost you the most. Loss Analysis (formerly Reliability KPIs) shows where your assets' time went over a date range, and how much production time was lost, all in minutes. Because every loss is in minutes, availability, performance and quality losses can be compared directly and added up: you can see at a glance whether downtime, slow running or scrap is costing you the most.
It works for one asset or for every OEE asset under a line, area or site, and reads them all in a few queries, so a whole site is as quick as one line.
Open it from Ops > Analysis > Loss Analysis. The ? button at the right of the filter bar opens a summary of this page.

Filters
- Asset: pick an asset, or a line, area or site. Every OEE asset under it is included.
- Date range: the range to analyse. Choose a period such as Today, Yesterday, This Week or Year To Date, or set your own dates.
- Short stop: unplanned stops shorter than this (in seconds) are minor stops, a performance loss; longer ones are unplanned downtime, an availability loss.
- Press Go. Changing a filter clears the results until you press Go again.
The figures at the top
| Figure | What it is |
|---|---|
| TEEP | Valuable time / calendar time: what the assets made of every hour in the range |
| Utilization | Production time / calendar time: how much of the range the assets were producing |
| OEE | Availability x Performance x Quality = valuable time / planned run time |
| Availability | Actual run time / planned run time |
| Performance | (Actual run time - performance loss) / actual run time |
| Quality | Valuable time / (actual run time - performance loss) |
Below them, the time figures show how the time breaks down. They are summed over every asset included, so a one-day range across several assets can add up to days.
- Production run time: the time the production runs took. Losses are only counted inside it.
- minus Planned downtime (stops with a Planned Downtime state, such as breaks) = Planned run time.
- minus the availability loss: unplanned downtime, every stop that is not running or planned and lasts at least Short stop.
- minus the performance loss: minor stops, plus speed loss = (standard count - actual count) x cycle time.
- minus the quality loss: waste x cycle time.
- What is left is Valuable time: good parts made at the standard rate.
Utilization
Does your plant have the capacity to take on more production? Where the calendar time went stacks each asset's time by mode, and the pie shows the total for every asset, so you can see how much time goes to idling, maintenance, cleaning or changeovers rather than production.
- Production (scheduled / unscheduled): producing inside / outside the asset's scheduled Production blocks in the operations schedule.
- Production delay: a production-type mode other than running production, such as Production Delay.
- Changeover & setup, Maintenance, Cleaning, Idle: by the mode's type.
- Other: any other mode.
- No data: no mode recorded (not plotted).
Schedule delay counts the scheduled Production blocks that started in the range: on time, started late (production began more than 5 minutes after the block's start), or not started at all, with the delay in minutes.
Scheduling information is crucial to getting real insight into how your assets are used. Whether you schedule in Kanoa's operations schedule or in another system, sharing the schedule with MES lets you see how well you are scheduling, as well as how well you are producing.
Click the Utilization header to hide this section and give the losses more room.
Losses and drill-down
- The three loss cards show the availability, performance and quality loss in minutes, and as a share of planned run time. The biggest is marked.
- Click a card, or a row under All losses, to see only that loss:
| Loss | Family | What it is |
|---|---|---|
| Unplanned downtime | Availability | Stops that are not running or planned and last at least Short stop |
| Minor stops | Performance | Unplanned stops shorter than Short stop |
| Speed loss | Performance | (Standard count - actual count) x cycle time, for each production run |
| Quality loss | Quality | Waste x cycle time, for each production run |
- By asset shows which assets lost the most to your selection; click an asset to narrow it further.
- Top reasons shows why:
- Downtime by the stop's state.
- Speed loss by the run's performance reasons, and quality loss by its scrap reasons (the waste counts' item states), in proportion to their minutes or waste.
- Loss that no reason covers is Unassigned. Unassigned is also the reason of automatic speed-loss events nobody has given a reason yet.
- Click the selection again, or the x, to go back.
Events
Events lists the events behind the selected loss, the most minutes first (up to 500): the stops for downtime, and for speed and quality loss a row per run and reason, with the run's Item. Export saves them to Excel.
Scripting
The screen's figures come from system.kanoa.event.getReliabilityData, and its events from system.kanoa.event.getReliabilityEvents, so you can use the same figures in your own screens and reports.