Skip to main content

Condition-Based Work

Some maintenance should follow how hard a machine works, not the calendar. Kanoa can raise a work order when an asset's run hours or a counter reach a threshold, or when a tool is close to a life limit. You don't raise these. They show up in your list. For example, Machine 1 - Spindle service comes from Machine 1's run hours, if it has been created: the Maintenance Manager track sets it up in Condition-Based Maintenance.

Recognise a Condition Work Order​

A condition work order looks like any other in Maintenance → Work Orders. Its title says what was raised, such as Machine 1 - Spindle service. It can appear a little after the threshold is passed, not at the exact moment, because Kanoa checks the conditions on a regular cycle.

A work order can be raised by:

  • Run hours: the asset has run a set number of hours since the last service.
  • Counter: an asset counter, such as parts made, has reached a set count.
  • Tool life: a tool, such as a mold, has used its Warn at % of a limit, for example its PM limit.

Respond to It​

  1. Open the work order and read its title, priority and Due Date, as in Your Work Queue.
  2. Work it as in Execute a Work Order: start it, follow any procedure, log your labor and complete it.

Completing the work order tells Kanoa the work is done. For a run-hour or counter work order, the next one is counted from this service. For a tool-life work order, completing it resets that count, the same as recording PM done, Refurbished or Calibrated on the tool's Life tab. So complete it only when the work is really done.

Where Tool Life Warnings Show​

A tool that is due or over a limit shows on the machine's info panel (the Tooling and Notifications cards) and in the Alert column of the tools list. Operators see these warnings when they mount the tool. The tool editor's Maintenance tab lists the tool's maintenance work orders, and you can double-click one to open it.

Reference Materials: Tool Life Statuses - When a tool is due or over a limit.

Statuses​

StatusWhen
AvailableNot mounted, within its limits.
MountedOn a machine or in a pocket.
Due for PM / Due for refurbishment / Due for calibrationWhen the tool has used its Warn at % of that limit. With a PM interval of 20,000 cycles and Warn at 90%, that's after 18,000 cycles, with 2,000 left.
Over limitPast a limit (PM interval, refurbishment interval, lifetime, max refurbishments or calibration date).
In repair, DamagedSet by hand. The tool can't be mounted.
RetiredSet by hand or by retiring the tool. The tool can't be mounted.

Statuses are updated as counts come in, and the gateway checks every tool's limits every hour, including calendar-day and calibration limits that pass with no counting at all. Tools that are due or over a limit appear in the tools list's Alert column, on the machine's info panel (the Tooling and Notifications cards), and in the Event Notifications widget.

Reference Materials: Tool Life with Kanoa Maintenance - How a tool raises a work order.

With Kanoa Maintenance​

Tooling tracks a tool's life and records its maintenance on its own; Kanoa Maintenance isn't needed. With a Kanoa Maintenance license, the work can be scheduled as maintenance work orders instead:

  1. In Kanoa Maintenance, create a work order template set to Condition, with the tool as its Asset.
  2. Pick the Tool Life condition and set Due for to the PM, refurbishment or calibration limit.
  3. When the tool reaches its Warn at % of that limit, a work order is created. Completing it resets that count, the same as PM done, Refurbished or Calibrated on the Life tab.

The tool editor's Maintenance tab lists the tool's maintenance work orders; double-click one to open it. See Work Order Creation & Scheduling.

Check Your Understanding​

  1. Name three things that can raise a condition-based work order.
  2. A tool-life work order is complete. What does completing it do to the tool's count?
  3. Where can you see the work orders for one tool?
Answers
  1. Run hours, a counter, or a tool reaching its Warn at % of a tool-life limit.
  2. It resets that count, the same as recording PM done, Refurbished or Calibrated on the tool's Life tab.
  3. On the Maintenance tab of the tool editor.