Assign Crews
Operators are usually scheduled as a crew, a named group that works together. Kanoa uses these assignments to compare who was meant to be at work with who actually logged in. This lesson shows you how to assign a crew or one operator to a shift.
Crews belong to a site, not to a single line. A crew assigned to a site shift covers whichever line each operator logs in to.
Open Crew Management
Open Ops → Scheduling → Crews from the navigation menu. The screen has three tabs: Crews, Crew Members and Scheduling.
Check the Crew
Most crews are set up once and left alone. Check that the crew you want exists and has the right people.
- On the Crews tab, look for the crew, for example Day Crew at the Philadelphia site. To add one, create a crew at the site.
- On the Crew Members tab, select the crew. Add or remove operators here.
- Give each member a start date, and an end date once they leave the crew.
Membership has dates, so the history of who was on which crew is kept when people move between crews.
Assign a Crew to a Shift
- Open the Scheduling tab.
- Assign the crew to the shift, for example Day Crew to the Day Shift at Philadelphia. Set the start and end of the assignment.
- Review the list of assignments. You'll see one assignment for each crew member, not one for the crew.
The assignment's start and end are the scheduled time. Kanoa doesn't recalculate them from the shift calendar, so enter the times you want people scheduled for.
Assigning a crew records who is on the crew on the assignment's start date. Someone who joins the crew later isn't added to shifts already assigned.
Assign One Operator
To cover a gap without changing a crew, assign a single operator to a shift on the Scheduling tab. Crew and individual assignments appear in the same list. Kanoa blocks overlapping assignments for the same person on the same shift or asset.
To change an assignment, use the Scheduling tab to view, end or delete it.
No. But without it, Attendance and Labor Gap have nothing to compare against. An operator who logs in without being scheduled is measured against the whole report window, which makes their attendance look low.
Check Your Understanding
- Is a crew tied to a line or to a site?
- You assign Day Crew to a shift, and a new member joins the crew next week. Are they on that shift?
- How do you cover one absent person without changing a crew?
Answers
- To a site.
- No. The assignment records who was on the crew on its start date.
- Assign an individual operator to the shift on the Scheduling tab.