Trigger and Notify
A Mode Change trigger issues a check when an asset enters a mode. The production run supplies both the asset and the item, which fills in the context the FAI requires.
Add the mode-change trigger
- Open
Machining - First Article Inspectionand go to the Triggers tab. - Add a trigger of type
Mode Changewith modeProduction. - Set Delay
5, Coming Due5, Over Due5and Grace5minutes. - Save and release the check sheet.
An automatic check only helps if the operator sees it. The Event Notifications widget lists checks that are due, and uncoded downtime, and opens them with one click.
Quality notifications dashboard
asset-quality-notifications-dashboard.json: the Asset Quality and Notifications dashboard, with Event Notifications, a date range selector, and an Asset OEE Bar Chart showing the Quality metric.
Set up the operator dashboard
- Open the dashboard editor and import
asset-quality-notifications-dashboard.json. It's created asOperator Dashboards\Asset Quality and Notifications. - Open
Machine 1's operation page, chooseAsset Quality and Notificationsin the dashboard selector, and make it the asset's default, as you did in Starting Production.
Trigger and complete an FAI
- In Run Control for
Machine 1, set the mode toChangeover, selectSC-2024on the Product tab, and click Start Run. The machine enters Production. - After the 5-minute delay, an FAI appears in Event Notifications. Click it to open Active Checks with Machine 1 selected.
- Open the FAI and confirm the asset and item are filled in.
- Enter three diameters near 25 mm, two lengths, and a visual result, then submit.
- Complete a second FAI on another machine. Trigger a third and leave it unfinished, so the next lesson has some late checks to analyze.
Finished check sheet
check-sheet-machining-first-article-inspection.json: the finished FAI check sheet, including the FAI Diameter tolerances, to compare with your build.