Inspect Incoming Material
When material arrives, many plants check it before it's used: who supplied it, which lot it is, when it expires, and what it looked like. Your Quality Manager decides whether your plant has a check like this and what it asks for. This lesson uses the Receiving Inspection, if it has been created: the Quality Manager track builds it in Build a Receiving Inspection. If your plant's check for incoming material has a different name or different fields, the steps are the same.
Add the Check for the Material
A check on a delivery is usually added by hand when the delivery arrives, rather than scheduled.
- Open Quality → Schedule → Active Checks and click Add Check.
- Choose the check sheet for incoming material.
- If Kanoa asks for an item, choose the material that arrived and click Add. Some check sheets offer only the items they apply to, such as raw materials.
- Open the new check.

The item ties the check to the material, so every inspection of that material can be found later.
The check sheet offers only raw material items. You'd choose AL6061 for a delivery of aluminum bar.
Fill In the Fields
A check item can hold different kinds of value. These are the ones you're most likely to see on a check for incoming material:
| Kind of value | What you do |
|---|---|
| Pick list | Tap a button. Each choice can count as a pass, a warning or a fail, or be neutral: recorded but not judged, such as the supplier. |
| Text | Type it, such as a lot number from the label. Click the blue i icon on the check for its instructions. |
| Date | Pick a date, such as the expiration date. |
| Image | Add a photo, such as the label or a damaged pallet. On a desktop you browse for a file; on a mobile device you can use the camera. |
| Barcode | On a mobile device with a camera, scan the label instead of typing it. |
- Fill in each item.
- Submit the check.
If the check sheet doesn't need a sign-off, the check goes straight to Approved when you submit it. If it does, it waits as Submitted until a Quality Manager approves it.
The check asks for the Supplier (a neutral pick list), the Lot Number (text), the
Expiration Date and an optional Product Image. The lot number must be 6 to 20 characters in capitals, so a lot
number such as ab123 is refused. It doesn't need a sign-off.
Take a Photo on Mobile
A mobile device is often easier at the dock: you can take the photo and scan the label where the delivery is.
- Open Mobile Check Schedule and add the check for incoming material.
- Fill it in as above. For an image item, take a photo with the camera.
Check Your Understanding
- Why does Kanoa ask for an item when you add a check for incoming material?
- What does a neutral choice on a pick list do?
- When does a submitted check go straight to Approved?
Answers
- The item ties the check to the material that arrived, so its inspections can be found later.
- It records the answer without passing or failing the check, such as the supplier's name.
- When its check sheet doesn't need a sign-off.
